How long does it take to fit a kitchen?

By Barry, Director, Zebra Kitchens and Interiors
Last updated · 5 min read

Fitted kitchen with brown and tan cabinetry

How long does it take to fit a kitchen is one of the first questions people ask, usually because they need to plan meals, work and family life around the job. The honest answer is that it varies. A simple door and worktop makeover is a much shorter job than stripping out an old kitchen and fitting a new one, and anything involving building work, moving walls or rerouting services adds more time again.

This guide gives general ranges rather than promises, explains what makes a job quicker or slower and suggests how to prepare so the work goes smoothly. When Barry visits for your free home visit and design, he can give you a clearer idea of timings for your particular kitchen.

How long does it take to fit a kitchen: general ranges

As a rough guide, and only as a guide, jobs tend to fall into these broad groups:

Type of workGeneral timescaleWhat it usually involves
Worktop replacementOften a short job once templatedRemoving old tops, fitting new ones, reconnecting sink and hob
Door swap or makeoverUsually a few daysNew doors, handles, panels and sometimes worktops on existing cabinets
New kitchen, same layoutOften around one to two weeksStrip-out, new cabinets, worktops, appliances and finishing
New kitchen with changesLonger, depending on the workMoving plumbing or electrics, plastering, flooring and other trades
Extension or knock-throughSet mainly by the building workKitchen fitted once the room is finished and dry

Every kitchen is different, and these are general ranges only. Your own timescale depends on the size of the room, the products and the work involved.

Why quartz adds a waiting stage

If you choose quartz worktops, there is usually a gap in the middle of the job. The cabinets go in first, then the worktops are templated precisely from the fitted units and made to measure. During that time you may have a working kitchen without its final tops, or a temporary arrangement for the sink.

Planning for this pause helps. Knowing it is coming means it does not feel like a delay.

What makes a fit take longer

Several things can extend the timescale:

  • Moving the sink, hob or other appliances to new positions
  • Electrical work such as new circuits, sockets or lighting
  • Removing walls, chimney breasts or old structures
  • Plastering and drying time before cabinets can go in
  • Uneven floors or walls that need extra preparation
  • Changes to the design once work has started
  • Waiting on other trades or building work to finish

Very few of these are unusual, but each one adds steps. A design that keeps services roughly where they are will generally be quicker.

What helps the job go smoothly

Agreeing the design fully before ordering is the single biggest help, as changes on site cause delays. Choosing appliances, sinks and taps early means the cabinets and worktops can be made to suit them. Clearing the kitchen before the fitters arrive saves time on the first day.

Good communication also matters. Customers have mentioned clear communication from design through to completion, and knowing who is coming and when keeps the job organised.

Living without a kitchen

For a full new kitchen you may be without cooking facilities for part of the job. Many people set up a temporary area elsewhere with a kettle, microwave and a few essentials. Paper plates, a cool box and a plan for simple meals make the time easier. A makeover usually causes much less disruption, as the cabinets and much of the kitchen stay in use.

The usual order of work

A new kitchen typically follows a familiar sequence: strip-out of the old kitchen, any first-fix plumbing and electrics, plastering or making good, flooring if it goes in first, cabinets, worktop templating, worktops, appliances, splashbacks and finishing. Tiling and decorating usually come last. Understanding the order helps you see why some days look busier than others.

Where building work is involved, the kitchen fit is one stage of a larger project and has to wait until the room is ready.

Fitting a kitchen in an extension

In an extension or knock-through, the overall timescale is set mainly by the building work. The walls need to be finished and dry, first-fix services in place and windows and doors fitted before the kitchen goes in. Planning the kitchen early, so your builder knows where services should go, helps the fit itself happen without hold-ups.

Planning your timings

The best way to get a realistic timescale is to have the kitchen measured and the design agreed. Barry can talk you through the likely order of work and timings for your kitchen on a free home visit, so you can plan around it with confidence.

It is also worth building in a little slack around important dates. If you have a family event, a holiday or guests arriving, try not to schedule the final days of the fit right before it. Small snags, deliveries and finishing touches can take a day or two longer than expected, and a buffer keeps the end of the job relaxed rather than rushed. We will always tell you if anything changes along the way.

Frequently asked questions

Related services, projects and areas

Service: Kitchen Renovations

Kitchen questions: Kitchen renovation questions answered

Areas we cover nearby: Cannock, Walsall, Stafford

Free kitchen design with Barry

Book a free home visit and kitchen design, or call in at our showroom on 181 Walsall Road, Great Wyrley.

CallFree Design